Skip to content
Southern Railways

Mapping 1,040 km of Southern Railways track

Railway corridor through an urban area.
Southern India
Client
Southern Railways
Sector
Infrastructure & Construction
Location
Southern India
Area surveyed
1,040 km

The challenge

Southern Railways needed its track and lineside assets digitised into topographic plans and a base map, over more than a thousand kilometres of corridor.

Our approach

Photographic ground truthing along the corridor, then topography mapping and 2D and 3D capture from orthomosaics, with features marked against the resulting base map.

The outcome

Track gradient and dimension maps produced across the full 1,040 km, with lineside features digitised into the base map.

Have a site like this one?

We will load a capture of your ground into the platform so you are judging it on your data.